Konsultprofil
Nationality: Swedish
Motivated, experienced and
professional engineer with 15 years documented track record within telecom. Experience in Design, test, trail projects and development of
Tools, methods and process. Diplomatic and tactful
with professionals and non-professionals at all levels, and used to colleagues
and associates in multinational environment.
Flexible and
versatile - able to maintain a sense of humor under pressure. Poised and competent with
demonstrated ability to easily transcend cultural differences. Thrive in
deadline-driven environments. Excellent team-building skills.
Areas of
Expertise
· Project Management
Coordination and Team leading
· Technical Project
administration
· Tools, Method & Process Development
· System &
Function Design, Specifications
· Test, Test Strategy & Automation,
Specifications, Scenario
· Real Time and
Embedded Systems Testing
· System Integration
& Verification
· UMTS Network
Planning & Management
· UMTS Operation
& Maintenance
· UMTS Node Integration
· Support
|
·
Project
Management |
PROPS |
|
·
Revision Management System |
Clear Case |
|
·
Trouble Reporting System |
ClearQuest , Customer Service Request (CSR) |
|
·
Radio
Access Tech. |
WCDMA, TDMA |
|
· Nodes |
RNC, Node-B, MediaGateWay |
|
· Testing |
Function, System,
Integration, Regression,
Interoperability Test, Automation |
|
·
Operating
Systems & Platforms |
OSE-Delta , Vxworks, Cello (CPP) |
|
·
Application
Software |
CELLO Based Applications for Utran Nodes |
|
·
Networks |
Ethernet, UTRAN, Transport Netwoks
(ATM, SDH
and PDH) |
|
·
Interfaces |
Iu(c/p), Iur,
Iub, Uu (RRC) |
|
·
Protocols |
RANAP, RNSAP, NBAP, ALCAP, TCP/IP, SS7 , AAL2 (Q.2630), MTP-3b, USAAL |
|
·
Environments |
Sun Solaris, Unix, NT |
|
·
Standards |
3GPP, ITU, ETSI |
|
·
Test tools |
3gsim,TTCN, Autosis, Expect, Nethawk,
Tektronix, ANT-20, InterWatch (IW) |
|
·
O&M Tools |
EMAS, OSS-RC, Cello test bed |
Company: Huawei
Technologies
UMTS Test Platform Development Project Feb. 2006- June 2006
• Test Method development
• Testing process in incremental development
• Tools development Technical studies, Analysis and Reports
• Test Automation Strategy
Company:
Ericsson Test Environment System administration Nov. 2005- Jan. 2006
¨ Preparation,
upgrade and Maintenance of SGSN,GGSN,GIS, RNC, RBS
Technical environment
Company:
Transport network Function Test
& Test Automation Jan. 2005 – Sept.
2005
¨ Function
Test
¨ Regression
Test
¨ Integration
and Verification
¨ Test
Environment Preparations & Configuration
¨ Test
Design
¨ Generating
and Executing Test Cases (scripts)
¨ Test
results Analysis, Debugging, Test Reporting
¨ Release
& Revision handling
¨ Function
& Regression Testing
¨ Troubleshooting
and Trouble Reporting
¨ Test
Configuration Management –TCM
¨ Tools,
Method and process improvements
¨
Preparation,
upgrade and Maintenance of Test Environment
Technical environment
Company:
3G Network Simulator Tool Test , Integration & Verification Sep.
2004 – Dec. 2004
¨ Function
Test, Integration and Verification
¨ Preparing
Test Specifications & scenario
¨ Providing
Test Cases
¨ Generating
and Executing scripts
¨ Test
results Analysis, Debugging, Test Reporting
¨ Test
Environment Configuration
¨ Release
& revision handling
¨ Function
& Regression Testing
¨ Troubleshooting
and Trouble Reporting
¨ Test
Configuration Management –TCM
¨ Tools,
Method and process improvements
¨ Preparation,
upgrade and Maintenance of Test Environment
Technical environment
·
Network
Protocols RANAP, NAS, NBAP, RRC, RLC, MAC,ATM,SDH,PDH
Company: Ericsson
China Ltd
UMTS Test
Environment Consultant Oct. 2003 –
Feb. 2004
¨ Technical
Coordination of Test Environment development
¨ Determining
environment requirements
¨ Support
testing in a multi-vendor, multi-platform
environment
¨ Resource
Forecasting & Planning
¨ Transport
& Radio Network Planning and
Configuration
¨ RNC,RBS
& MGW Upgrade & Operation & Maintenance
¨ Test
specification
¨ Generating
and Executing scripts
¨ Node
Integration and Test
¨ Troubleshooting
and Trouble Reporting
¨ Test
Configuration Management –TCM
¨ Tools,
Method and process improvements
¨ Preparation,
upgrade and Maintenance of Test Environment
¨ Organization,
co-ordination & implementation of
Software solutions and upgrades in UTRAN Elements
¨ Information
Management
¨ Co-ordination
and working with 2nd level Support
Technical environment
Company: Ericsson Italia S.P.A
¨ Support
in Fault Management (1st Level) and troubleshooting of Software and Hardware
Faults of the UTRAN Elements
¨ Preparing
Test Specifications, Executing test
cases in UTRAN live Network and IOT-Test Plant
¨ Network
Integration and Field Test
¨ Operation
& Maintenance of Ericsson UTRAN Network Elements ( RNC, NODE B, MGW)
¨ Utran Node and Network configuration,
generating & executing scripts
¨ Regression Testing
¨ Acceptance
Test
¨ Organization
and co-ordination of the implementation of Software solutions and upgrades in
UTRAN Elements
¨
Co-ordination and
working with 2nd and 3rd
level Ericsson Support
Technical environment
Company Siemens AG
RNC Function
Test Consultant Sept. 2001 – April 2002
¨ Providing
Test specifications for L3 Function tests on Iur and Iub (RNSAP ,ALCAP,NBAP protocols)
¨ Release
& revision handling
¨ Providing
Test Cases & Scripts in TTCN
¨ Execution
of test cases , Debugging
¨ Function
& Regression Testing
¨ Trouble
shooting
¨ Test
Reporting
Technical environment
Company Ericsson Radio
Systems AB
UMTS Network Planning Co-ordinator Feb. 2001 – May 2001
¨ Conducting
& Co-coordinating Network Planning Activities and Optimization
¨ Network
planning, Node Configuration & Network Integration
¨ Test
environment setup coordination
¨ Dimensioning
& Providing Network Data And Node Configuration
¨ Providing
Core Network Data Transcript (MSC,RBS,HLR)
¨ Time,
Resource, Activity & Release Planning
¨ Documentation, Change and Revision Handling
Technical environment
Company Ericsson Utvecklings AB
GSM R.7
Project Software Design Test leader - Aug. 2000 – Feb 2001
¨ Function
Test ( Ericsson’s Regional Processors)
¨
Automation of Test environment
¨ Providing
Test Specifications
¨
Providing Test Case Instruction
Scripts
¨
Setting up and executing the test
¨
Evaluating test execution
¨
Recovering from errors
¨ Regression Testing
¨
Conformance Test
Technical environment
Company Ericsson
Radio Systems AB
RNC Integration & Verification Test leader Dec.
1999 – Aug. 2000
¨
Responsible for Test Planning,
Specifications, Scripts, Execution and Reports of RNC Integration & Verification
¨
Direct the activities of a medium
size team, responsible for Integration & Verification team.
¨
In conjunction with other teams
within Ericsson, develop test plans and procedures for Integration &
Verification
¨ Participation
in the Quality Procedure, Test tools and methods Development reference group
& Initiating and managing Workshop
¨ Resource
& Time Planning
¨ Providing
technical direction
¨ Providing
regular status reports to project and team management
¨ Tools
and set up processes and procedures to facilitate the tracking of defects and
progress metrics.
¨ Handling
of Trouble reports
Technical environment
Company Ericsson
Radio Systems AB
Maintenance
Project Manager Feb.
1999 – Dec. 1999
¨ Responsible
for Maintenance of WCDMA
Experiment System for different markets
¨ Initiating
and managing Workshop
¨ Handling
project feasibility study, execution and conclusion phases
¨ Resource,
Time & Release Planning
¨ Day
to day direction of a medium sized SW
Design, Integration & Verification team
¨ Plan
and coordinate RNC, RBS (NODE-B) and MSC Design & Testing team activities
¨ Coordinating Trouble reports handling
¨
Supervising build
Technical environment
Company Ericsson
Radio Systems AB
WCDMA Trail Leader -
¨
Responsible for WCDMA Experiment
System Test Strategy and Planning, Specifications, Scripts, Execution and
Reports
¨
Features included connection set
up and release for Speech & UDI (RAB)
¨ Responsible
for a successful TRIAL of WCDMA Experiment System in Beijing-China
¨
Managing all aspects
of the operation ranging from Planning & Preparations, Resource Planning,
Resource Competence development, Workshop, project execution, conclusion and
final evaluation & reporting of the project.
Technical environment
Company Ericsson
Radio Systems AB
Integration
and Verification Engineer Dec. 1997– Nov. 1998
¨ Regression
test
¨ System
Test
¨ Integration
& Verification of the MSC, RNC, NODE-B & Mobile Simulator.
¨
Setting up and executing the test
¨
Evaluating test execution
¨ Recovering
from errors
¨ UNIX
Environment, Cello and OSE-Delta Real Time operating System, Agilent BSTS
¨
WCDMA
Experiment System Test Planning, Test Specifications, Test Scripts, Test
Execution and Trouble Reports handlings
Technical environment
Company Ericsson
Radio Systems AB
Data Transcript Engineer & Tools development
Project Manager June 1995– Dec. 1997
¨ Network
& Node Configuration (MSC,RBS and
HLR )
¨ IN
features implementation
¨ Project
Pre-Studies
¨ Requirement
Specifications
¨ Load and Traffic Test
¨ Project
Manager for Method Development ( Instructions) & Implementation
¨ Project
Manager for Tool Development &
Global Implementation
¨ Project
Manager for Engineering Process Development & Implementation
¨ Initiating
and managing Workshop
¨ Information
Management modeling
¨ Quality(
Verifying, Measurements And Lead-Time)
¨ tools:
DTSS
Technical environment
Company Ericsson
ES201 System & Function Design Aug. 1990– June 1995
¨
System Study
¨
Function Specifications
¨
Software Development & Design
Test
¨
Test specifications
¨
Integration Test
¨
Project Pre-Studies, Resource
& Time Planning, Follow up, Reporting
& conclusion
¨
Data Base development as Trouble
Reporting System & Version manager
Technical environment
¨
Electronics And Computer
Engineering - Orebro Institute Of Technology -
¨
Electronics - Lund Institute Of Technology -
¨
Electronic Communication -
¨
Advanced Level in Mathematics
& Physics -
Swedish
English